Hazar, Turkmenistan – Sonnenberg Power Solutions (SPS) has successfully completed a major field service project onboard the Palwan vessel, operated by Dragon Oil, in Hazar, Turkmenistan.
The assignment covered the supply of spare parts, repair, and performance verification of two Bergen C25:33 engines. SPS supplied the required spare parts and deployed a Senior Field Service Engineer to work alongside Dragon Oil’s Marine technical team and the Palwan crew throughout the project.
The work comprised a comprehensive assessment of the engines and critical components, cylinder head repair and overhaul, bearing checks and replacement where required, engine reassembly, and final testing. All activities were carried out in accordance with Bergen Engines’ procedures and quality standards.
Close cooperation between the SPS and Dragon Oil teams supported efficient execution from parts delivery and technical assessment through repair, reassembly, and testing. Upon completion, both engines successfully passed functional testing and a sea trial, confirming their performance under operational conditions.
The project was completed safely and on schedule, supporting the vessel’s continued operational readiness and demonstrating the effective teamwork between the SPS engineers, Dragon Oil’s marine technical team, and the Palwan crew.
The project demonstrates SPS’s capability to deliver complete Bergen Engines field service and repair solutions in demanding marine and offshore environments, combining specialist expertise with genuine Bergen Engines spare parts.
As the authorized Sales and Service Partner for Bergen Engines in Central Asia, SPS provides original spare parts, field service, maintenance, repair, and technical support across the region.
Sonnenberg Power Solutions — trusted Bergen Engines service and support across Central Asia.
